Project: Bovine-RV14A   -  
            Listing for Category : Tail Feathers
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Aug 03, 2023     Drilling, countersinking, deburring, scuffing H-stab spar - (2.0 hours)       Category: Tail Feathers
In this session, I clecoed the spar doubler plate to the spar and final drilled all of the matching holes. A couple of the larger 1/4" holes were called out to be final drilled using a drill press, so I did that too. Next, a dozen holes on the spar doubler and a bunch more on the spar flange had to be machine countersunk to allow flush rivets to be later installed.

Then I unclecoed all of the parts and begun a final deburring of all of the new holes, and then a quick scuff of all of the surfaces with a scotchbrite pad and a wipedown with acetone to prepare for priming.

What's next? Time to prime these parts and then begin riveting these spar parts together.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.